Finance education, free and open.An independent learning project
THEFINANCE ARCHIVES
Finance foundationsEquitiesFixed incomeDerivativesEconomicsFinancial statementsPortfolio management
Home / Finance foundations / Capital at Risk and How Much You Could Lose
Finance foundations

Capital at Risk and How Much You Could Lose

Calculate how much of your capital is at risk in a fully paid investment or a contract, and see when posted collateral is smaller than your total loss.

In this chapter

Intermediate

Capital at risk is the amount of your money exposed to loss. The phrase is most helpful when it comes with a dollar figure and the condition that produces it. A scenario loss is what you lose if a particular outcome occurs. A maximum loss is the most you could lose under stated terms. Cash you put up at the start can be different from both.

Before doing the arithmetic, identify the payment that gets the position started and any other payments it can require. Write down the period, price assumptions and costs. If a loss bound comes from the contract, check which term provides it.

Find the exposure in a fully paid investment

Worked example. A fund falls or goes to zero

You pay $1,800.00 for fully paid units in a hypothetical fund. The units can fall to zero. You have no borrowing, no obligation to put in more money and no additional costs or tax. All amounts are USD. Assume no distributions during the measurement period.

A 35% decline leaves \(1{,}800(0.65)=\$1,170.00\). The scenario loss is $630.00. If the units go to zero, you lose the whole $1,800.00. The maximum loss is $1,800.00 under those terms. The scenario result describes one price decline. The maximum uses the lowest possible value and the absence of further payment obligations. This calculation does not assign a probability to either outcome.

Follow a position whose deposit is smaller than its loss

Worked example. Settle a contract with posted cash

Suppose you enter a hypothetical one-month contract on 50 units of a reference asset. At the end, you receive $50.00 in total for every $1.00 the reference price finishes above $40.00 per unit. You pay $50.00 for every $1.00 it finishes below $40.00. The contract defines the settlement reference price as no lower than $0.00. You post $600.00 in cash as collateral, money held to help secure your obligation. There is no upfront premium, collateral interest, interim payment, early closeout, fee or tax. Assume both parties perform as specified.

\[ C=q(S_T-K) \]

\(C\) is the signed cash settlement in USD before applying collateral. \(q=50\) is the number of reference units, \(K\) is the fixed contract price in USD per unit, and \(S_T\) is the reference price in USD per unit on the settlement date \(T\). A positive \(C\) is paid to you. A negative \(C\) is owed by you. The initial collateral is applied against what you owe, with any excess returned. If there is a gain, all collateral is returned and you receive the gain.

Settlement reference price (USD per unit)Signed settlement (USD)What happens to the $600.00 postedAdditional cash you must pay (USD)
$47.00+$350.00All returned$0.00
$28.00−$600.00All used to pay the loss$0.00
$18.00−$1,100.00All used to pay part of the loss$500.00
$0.00, the price floor−$2,000.00All used to pay part of the loss$1,400.00

At $18.00 per unit, you owe \(50(40-18)=\$1,100.00\). The collateral pays $600.00 of that bill. You must supply another $500.00, for a total scenario loss of $1,100.00. Adding the full bill to the posted cash would count the $600.00 twice. At the contract’s price floor, the maximum settlement loss is \(50(40-0)=\$2,000.00\). The maximum payment beyond the cash posted is $1,400.00. The contract terms, rather than the opening cash transfer, determine the loss bound.

Check what the loss estimate includes

For a position with obligations, separate the maximum you can lose from when you might have to put up cash. A contract that calls for more collateral during the month could create a funding need before final settlement. If its pricing terms allow losses outside the scenarios you tested, keep the figures labelled as scenario losses. Only report a maximum after checking the price or payoff limits and any charges or separate obligations. A fixed non-refundable $25.00 charge, for example, would raise the contract example’s all-in maximum loss from $2,000.00 to $2,025.00 if everything else stayed the same.

Practice questions

Choose one answer per question. Use the stated assumptions and round final dollar amounts to cents.

1. Identify a scenario loss

Fully paid units cost $900.00 and fall 20%. Their minimum value is zero and there are no fees, distributions or additional obligations. What is the loss in this scenario?

Question 1 choices

B is correct

  • A. The entire starting amount is the maximum loss under the terms. The units have not fallen to zero in this scenario.
  • B. Twenty percent of $900.00 is $180.00.
  • C. $720.00 is what remains after the decline.

2. Use a stated payoff floor

A cash-settled contract makes you pay for every dollar a reference price falls below $30.00 per unit on 40 units. The settlement price cannot be below zero. There are no other costs. What is the maximum loss?

Question 2 choices

A is correct

  • A. A fall to zero costs \(40(30-0)=1{,}200\) dollars.
  • B. $30.00 is the largest price difference per unit. The contract covers 40 units.
  • C. A zero reference price produces the biggest payment you owe.

3. Split collateral and a later payment

You posted $400.00 on a contract. You owe $760.00 at settlement and the whole deposit is credited against it. There are no other charges. What are your total loss and additional payment?

Question 3 choices

C is correct

  • A. This counts what you pay today and omits the collateral you lose.
  • B. This adds the collateral to the full amount owed despite the credit.
  • C. The $760.00 loss is funded with $400.00 already posted and $360.00 in new cash.

4. Follow a smaller loss

You post $600.00 as collateral. Settlement leaves you owing $250.00. The contract applies collateral to the loss and returns any excess. No other payments apply. What comes back to you?

Question 4 choices

A is correct

  • A. The contract uses $250.00 from the deposit and returns \(600-250=350\) dollars.
  • B. $250.00 is the loss paid out of the deposit.
  • C. A full refund would ignore the part of the deposit used to pay the loss.

5. Check the scope of a stress result

A report says a position could lose $500.00 if a particular price falls 10%. It gives no payoff limits. What can you call the $500.00?

Question 5 choices

B is correct

  • A. You would need to check the payoff and contract limits before calling it a maximum.
  • B. The figure is tied to the stated price move.
  • C. A scenario calculation does not reveal the required collateral.

6. Include a fixed upfront charge

A contract has a known maximum settlement loss of $1,000.00. A separate non-refundable fee of $35.00 is paid at entry. There are no other costs. What is the all-in maximum loss?

Question 6 choices

C is correct

  • A. The fee adds to the total amount lost. It does not offset the settlement bill.
  • B. That covers the settlement loss alone.
  • C. The $35.00 is lost even in the maximum-loss scenario. Add it to the $1,000.00 settlement loss.

Find a finance concept

Press Enter to see all matching chapters.